This apartment
has seventeen floors. In this projects’ walls and columns
were solved with İNTEVA system and 150A climbing systems.
Slabs were solved with İNTEFLEX system. Outer sides
of the outer facade formwork and climbing brackets on
which they were settled, were given as full set for
all the wall formwork columns aside from those interior
formworks sufficient for pouring in two times were given.The
heights of the outer side formwork of the outer facade
were designed according to the top level of slab. (H=310
cm) Thus, outer side formwork were provided to establish
stop ends for the slab formwork. |