POMPA STATION CONSTRUCTION / ŞANLIURFA
CONTRACTOR : KOLİN İNŞAAT
At the Pomp Station constructrion, İNTEVA wall formwork system, 150A and 150B climbing systems were used. 22 meters heights walls were poured by being climbed step by step. The scissors spindle 150B system which allows the wall formworks to be with drawn for 70 cm on climbing brackets in addition to the systems in which climbing brackets and wall formworks are carried together and the system in which climbing brackets and wall formworks are carried separately, the two different applications of 150A climbing system were used together in harmony.






   Copyright © 2005 İntek Incorporated. All rights reserved.
    designed by [Burak.UGURLU]