At the Pomp
Station constructrion, İNTEVA wall formwork system,
150A and 150B climbing systems were used. 22 meters
heights walls were poured by being climbed step by step.
The scissors spindle 150B system which allows the wall
formworks to be with drawn for 70 cm on climbing brackets
in addition to the systems in which climbing brackets
and wall formworks are carried together and the system
in which climbing brackets and wall formworks are carried
separately, the two different applications of 150A climbing
system were used together in harmony. |