The project had 4 blocks with 5 floors. It was solved successfully with HD150 tableform and İNTEVA wall- column system.
1 set for A and 1 set for c block’s slab formwork, 3 sets elevator and stairs shaft formworks, 4 sets 50x50, 6 sets 40x40 column formworks were used in the project and it was completed in very short period like 120 days.